SPACE OF CLIMATES AND BURGUNDY WINES

SPACE OF CLIMATES AND BURGUNDY WINES

SPACE OF CLIMATES AND BURGUNDY WINESBulding of space of Climates and Burgundy wines - Beaune (21) Completed in 2023Team : Groupe Rougeot, Emmanuelle Andreani Architectes, Batiserf, B27, CSI, Illiade, Terre eco, Génie acoustique, Alice dans les villes, Cad@work,...

THE FARMHOUSE TO THE STAIRS

THE FARMHOUSE TO THE STAIRS

THE FARMHOUSE TO THE STAIRSRehabilitation of La Ferme aux Escaliers into a leisure centre without accommodation and a school catering area for children– Aiserey (21) Completed in 2021Team : Graglia BTP, Emmanuelle Andreani Architectes, BILD, Bourgogne structure,...

COMPLEX AL-NOURI

COMPLEX AL-NOURI

COMPLEX AL-NOURIBuilding of Al-Nouri mosque , college, arts and architecture school, administrative and conference center – Mosul (Irak) Competition 2021Team : Emmanuelle Andreani Architectes, Randa Mahmoud Architecte Caracteristics : UNESCO World heritage, local...

THIRD PLACE

THIRD PLACE

THIRD PLACEBuilding of third place, média library, associative and musical space – Grésy-sur-Aix (73) Competition 2022Team : Emmanuelle Andreani Architectes, Atelier de Cairns, Synapse construction, Génie acoustique, Proman, François Tourny Scénographie Caracteristics...

LES ILÔTS VERTS

LES ILÔTS VERTS

LES ILÔTS VERTSBuilding of 67 flats – Saint-Priest (69)Delivered in 2022TEAM : Emmanuelle Andreani Architectes, Tem Parterns, PrelemCARACTERISTICS : RT 2012 -20%, Certification NF, Référentiel habitat du Grand Lyon, Label Effinergie +CLIENT : Vinci...

SCHOOL SYSTEM MARCUS

SCHOOL SYSTEM MARCUS

SCHOOL SYSTEM MARCUSRestructuring and extension of the school group Marcus – Lezoux (63) Work in progress, estimated for 2025Team : EMMANUELLE ANDREANI ARCHITECTES, Carole Porté, A.E.S, H3C Energies, Cogeci, GBA Energies, SEEC Caracteristics: Clean building, TR 2012,...

FEEL CROIX-ROUSSE

FEEL CROIX-ROUSSE

FEEL CROIX-ROUSSEBuilding of 24 social housing, 26 housing and nursery – Lyon 4e (69) Completed in 2020TEAM : Emmanuelle Andreani Architectes, Philea, Tem Partners, Grasset CARACTERISTICS : BBC Effinergie, Label HPE rénovation, référentiel habitat durable du Grand...

SCHOOL SYSTEM DES BROSSES

SCHOOL SYSTEM DES BROSSES

SCHOOL SYSTEM DES BROSSESRestructuring and extension of the school group Des Brosses – Lezoux (69) Work in progress, estimated for 2027TEAM : Emmanuelle Andreani Architectes, Otéis, Urbalab, Cuisine ingenierie, Génie Acoustique, Ecometris CARACTERISTICS : RE2020,...

VILL’ARBOREA – ZAC DES GIRONDINS

VILL’ARBOREA – ZAC DES GIRONDINS

VILL’ARBOREA – ZAC DES GIRONDONSBuilding of 32 social housing, 110 housing and shop – Lyon 7e (69) Completed in 2022TEAM : EMMANUELLE ANDREANI ARCHITECTES, CETIS, EODD, TERRE ECO CARACTERISTICS : RÉFÉRENTIEL DURABLE GRAND LYON 2013, QEB RHÔNE-ALPES 2013, CERTIFICATION...

LE POLYGONE

LE POLYGONE

LE POLYGONEBuilding the house of childhood, a gymnasium, polyvalent spaces and a school restaurant – Lyon 3e (69) Completed in 2014TEAM : Emmanuelle ANDREANI Architectes – SNC Lavalin (EDEIS), Batiserf, Atelier de la grande cuisine, Médicis CHARACTERISTICS : HQE...

FOLIA – ÎLOT G2.2

FOLIA – ÎLOT G2.2

FOLIA - ÎLOT G2.2Building of 95 social housing, shops and offices – Lyon 7e (69) Competition in 2022TEAM : Emmanuelle Andreani Architectes, Urbalab, Katene, Cogeci, Réciprocité CARACTERISTICS : RE2020, référentiel NF Habitat durable 2022 du Grand Lyon, Niveau 2 du...

SCHOOL GROUP DIDEROT

SCHOOL GROUP DIDEROT

SCHOOL GROUPS DIDEROT, GÉMEAUX, DOLET BOILEAUMPGP energy renovation and accessibility of the triple school groups on an occupied site - Lyon (69) Chantier en cours, livraison prévue en 2025TEAM : Citinea (mandataire), Emmanuelle Andreani Architectes, Ferrand sigal...

B2 CONFLUENCE BLOCK

B2 CONFLUENCE BLOCK

B2 CONFLUENCE BLOCKConstruction d’un programme mixte of housing, offices, shops, nursery, student residence and parking – Lyon 2e (69) competition 2015TEAM : 5+1AA, EMMANUELLE ANDREANI ARCHITECTES, ANNE GARDONI Paysagiste, ARTELIA, INDDIGO, Génie acoustique, ANTEA...

MONTÉE DE VERDUN

MONTÉE DE VERDUN

MONTÉE DE VERDUNBuilding of 53 social housing, 34 housing – Tassin-la-Demi-Lune (69) Work in progress - 2025TEAM : Emmanuelle Andreani Architectes, Philipe Sletec, GC2E, Etamine, Wabi Sabi CARACTERISTICS : RT 2012, démarche HQE CLIENT : Ogic immobilier AREA : 4 308 m²...

JULES FERRY MUSIC SCHOOL

JULES FERRY MUSIC SCHOOL

JULES FERRY MUSIC SCHOOLBuilding of a music school – Tassin-la-Demi-Lune (69) Completed in 2006TEAM : Emmanuelle ANDREANI Architectes – COPLAN Rhône Alpes PRESENTATION :Nominated for the « Equerre d’Argent » prize Prize for the first project, urban and landscape...

SYMBIOZ

SYMBIOZ

SYMBIOZBuilding of 70 housing and shops – Vénissieux (69) Completed in 2022TEAM : EMMANUELLE ANDREANI ARCHITECTES, D2P, ILIADE, EODD CARACTERISTICS : ER 2020, BBC EFFINERGIE + HQE process, LABEL NF HABITAT HQECLIENT : SOGEPROM AREA : 5 500 m² BUDGET : 7 140 000€ HT...

SCHOOL SYSTEM LA PLAINE GRANDS CHAMPS

SCHOOL SYSTEM LA PLAINE GRANDS CHAMPS

SCHOOL SYSTEM LA PLAINE GRANDS CHAMPSExtension and restructuring of three schools – Paris 20 eme (75) Completed in 2014TEAM : Emmanuelle ANDREANI Architectes – Studetech – Alma consulting – Prévention incendie CHARACTERISTICS : Paris’s climate plan, THEP label, wood...