SCHOOL SYSTEM DES BROSSES

SCHOOL SYSTEM DES BROSSES

SCHOOL SYSTEM DES BROSSES

Restructuring and extension of the school group Des Brosses – Lezoux (69)

Work in progress, estimated for 2027

TEAM : Emmanuelle Andreani Architectes, Otéis, Urbalab, Cuisine ingenierie, Génie Acoustique, Ecometris

CARACTERISTICS : RE2020, E3C2, Biosourcé niveau 3, wood structure and vegetal concrete of hemp

CLIENT : City of Communay

AREA : 2 091 m²

COST : 6 483 000€ excluding taxes

PICTURES : Inui, Emmanuelle Andreani Architectes

VILL’ARBOREA – ZAC DES GIRONDINS

VILL’ARBOREA – ZAC DES GIRONDINS

VILL’ARBOREA – ZAC DES GIRONDONS

Building of 32 social housing, 110 housing and shop – Lyon 7e (69)

Completed in 2022

TEAM : EMMANUELLE ANDREANI ARCHITECTES, CETIS, EODD, TERRE ECO

CARACTERISTICS : RÉFÉRENTIEL DURABLE GRAND LYON 2013, QEB RHÔNE-ALPES 2013, CERTIFICATION QUALITEL, BBC EFFINERGIE

CLIENT : NEXITY APOLLONIA

AREA: 10 487 m²

COST : 14 033 000€ excluding taxes

PHOTOGRAPHY : Guillaume Perret

LE POLYGONE

LE POLYGONE

LE POLYGONE

Building the house of childhood, a gymnasium, polyvalent spaces and a school restaurant – Lyon 3e (69)

Completed in 2014

TEAM : Emmanuelle ANDREANI Architectes – SNC Lavalin (EDEIS), Batiserf, Atelier de la grande cuisine, Médicis

CHARACTERISTICS : HQE procedure (14 cibles), low-energy building, wood structure

CLIENT : City of Lyon

AREA : 1845 m²

COST : 4 584000€ excluding taxes

PHOTOGRAPHY : Frenchie Christogatin

FOLIA – ÎLOT G2.2

FOLIA – ÎLOT G2.2

FOLIA – ÎLOT G2.2

Building of 95 social housing, shops and offices – Lyon 7e (69)

Competition in 2022

TEAM : Emmanuelle Andreani Architectes, Urbalab, Katene, Cogeci, Réciprocité

CARACTERISTICS : RE2020, référentiel NF Habitat durable 2022 du Grand Lyon, Niveau 2 du label Bâtiment biosourcé

CLIENT : Eiffage Immobilier

AREA : 7 245 m²

COST : 11 000 000€ HT

IMAGES : YAM, Emmanuelle Andreani Architectes

SCHOOL GROUP DIDEROT

SCHOOL GROUP DIDEROT

SCHOOL GROUPS DIDEROT, GÉMEAUX, DOLET BOILEAU

MPGP energy renovation and accessibility of the triple school groups on an occupied site – Lyon (69)

Chantier en cours, livraison prévue en 2025

TEAM : Citinea (mandataire), Emmanuelle Andreani Architectes, Ferrand sigal architectes, AA Groupe, Quadriplus, Vinci facilities

CARACTERISTICS : BBC renovation, réduction de 55% d’énergie primaire, ITE 100% biosourcés d’énergie solaire, protection solaire passive, CPE sur 10 ans

CLIENT : SPL Oser – ville de Lyon

AREA : 10 260 m²

COST : 13 000 000€ excluding taxes

PICTURES : Emergence